In order to save time and money, unimpeded communication among the parties involved in the design process is the key to success.
- Load case studies and structure analysis
- Preparation of construction documents (plans and specifications)
- Kick-off meeting with design/building team (EOR & fabricator)
- Connection principles for review
- Connection design for approval
- Production of shop drawings
- Approval of shop drawings